The striking white bus drivers building in the bus station at Amsterdam Central houses a workspace, pantry and a canteen for bus drivers on the first floor.
Bus Drivers Building
Placed between two glass windscreens, Benthem Crouwel’s building for the bus drivers in the bus station at Amsterdam Central has a sleek, yet playful appearance.
View Article details
- 16 October 2015
- Amsterdam
Because the canteen is located on this higher level the drivers have a lot of privacy, with 180 degree views of the bus platform, the river IJ and Amsterdam North. On the ground floor there is space for storage, a technical area and toilets. The bus drivers building has been built in three months.
The position of the building, between two glass windscreens, has largely determined the proportions of the volume. The elongated, relatively narrow building of 80 sqm has been optimized in both design and function. By placing a spiral staircase on the eastern rounded end wall, freedom for designing the layout of both storeys became possible. In addition, because of the roundness and the linear character, the shape of the bus drivers building connects to the previously realized tubular supervisor building on the other side of the bus platform. The positioning of the facility areas ensures that on the ground floor the facade can be closed and can be made graffiti resistant.
The bus drivers building has a timber frame construction and is finished on both the inside and outside with polyurea, a two-component spray that is very durable and that can be applied seamlessly. By using traffic light red on the inside and white polyurea on the exterior, the building has a sleek, yet playful appearance that matches the red lettering of the bus stations’ roof.
Bus Drivers Buiding, Bus station Amsterdam Centraal, The Netherlands
Program: workplace
Architects: Benthem Crouwel Architects
Project team: Joost Vos, Saartje van der Made, Peter Alberts
Structural engineering: Versteeg Utrecht BV
Contractor: Versteeg Utrecht BV
Mechanical services: NIAG (Nederlandse Installatie Advies Groep)
Area: 80 sqm
Completion: 2015