The bridge features a massive arch reaching a height of 12 metres above water level, in a continuous line with the Melkweg, offering views over the city and allowing those who cross it to appreciate the relation between the new and historic center of Purmerend.
"The aim of the design team was to create a new area with a specific identity, which could work as a connector between the old and the new centre," state NEXT architects. Adjacent to the massive pedestrian bridge, a 100 metre-long bicycle deck forms a second bridge, allowing for the remaining traffic to cross the river.
The pedestrian bridge weighs 85 tonnes, comprising 130 steps. Its shape flows evenly into the bicycle bridge, creating one single whole. This unity is enhanced by the continuity of materials and colours.
Architects: NEXT Architects
Client: Purmerend Municipality
Collaborators: Ronald Rietveld Landschaparchitectuur
Consultants: Ingenieurs Bureau Amsterdam (IBA), ABT Adviesbureau voor Bouwtechniek
Contractor: Van Hattum en Blankevoort
General contractor: VSF
Installations: Istemawa
Cost: € 6.000.000,00
Completion: October 2012