The position of the building, between two glass windscreens, has largely determined the proportions of the volume. The elongated, relatively narrow building of 80 sqm has been optimized in both design and function. By placing a spiral staircase on the eastern rounded end wall, freedom for designing the layout of both storeys became possible.
In addition, because of the roundness and the linear character, the shape of the bus drivers building connects to the previously realized tubular supervisor building on the other side of the bus platform. The positioning of the facility areas ensures that on the ground floor the facade can be closed and can be made graffiti resistant.
Bus Drivers Buiding, Bus station Amsterdam Centraal, The Netherlands
Program: workplace
Architects: Benthem Crouwel Architects
Project team: Joost Vos, Saartje van der Made, Peter Alberts
Structural engineering: Versteeg Utrecht BV
Contractor: Versteeg Utrecht BV
Mechanical services: NIAG (Nederlandse Installatie Advies Groep)
Area: 80 sqm
Completion: 2015